Skip to Content

ichappsseo

Operation Of Thermolab Hot Water Bath

Operation Of Thermolab Hot Water Bath

Submitted by • about 1 day ago

ichapps.com - To lay down the procedure for operation of THERMOLAB – Hot water bath. This procedure is applicable in Quality Control department. Remove the lid of the water bath provided at the top. Fill water in the bath to a level ...

Operation Of Thermolab Muffle Furnace

Operation Of Thermolab Muffle Furnace

Submitted by • about 1 day ago

ichapps.com - To lay down the procedure for operation of THERMOLAB – Muffle Furnace. This procedure is applicable for Quality Control department. Open the square door of the Muffle furnace. Take the sample to be dried in a suitable container and keep ...

Operation Of Thermolab Oven

Operation Of Thermolab Oven

Submitted by • about 1 day ago

ichapps.com - To lay down the procedure for operation of THERMOLAB – Oven. This procedure is applicable in Quality Control department. Switch on the Mains switch. For setting the required temperature, in the temperature indicator, press the upward key to increase the ...

Operation Of Titrino 794 Basic Titrino

Operation Of Titrino 794 Basic Titrino

Submitted by • about 1 day ago

ichapps.com - To lay down the procedure for operation of Metrohm 794 Basic Titrino. This procedure is applicable for Quality Control department. Switch on the Instrument and the PC. Double Click on the Tinet 2.5 Icon. Metrohm Tinet window appears on the ...

Operation Of Western Cooler

Operation Of Western Cooler

Submitted by • about 3 days ago

ichapps.com - To lay down the procedure for operation of western - cooler. This procedure is applicable in Quality Control department. Turn on the mains switch. Open the door by pulling it towards us. Rotate the knob provided at top compartment in ...

Operation Of AG285 Mettler Toledo Analytical Balance

Operation Of AG285 Mettler Toledo Analytical Balance

Submitted by • about 3 days ago

ichapps.com - To lay down the procedure for operation of AG285 - METTLER TOLEDO Analytical balance. This procedure is applicable Quality Control department. Ensure that the working area and Balance is clean. Clean the weighing pan with small brush. Check all the ...

Maintenance Of Registers

Maintenance Of Registers

Submitted by • about 3 days ago

ichapps.com - To lay down the procedure for maintenance of registers in quality control department. This procedure is applicable for Quality Control Department. All the registers used in the quality control department shall be numbered. One register shall be maintained for the ...

Operation Of AG285 Mettler Toledo Analytical Balance

Operation Of AG285 Mettler Toledo Analytical Balance

Submitted by • about 3 days ago

ichapps.com - To lay down the procedure for operation of AG285 - METTLER TOLEDO Analytical balance. Ensure that the working area and Balance is clean. Clean the weighing pan with small brush. Check all the doors of the balance are closed. Adjust ...

Maintenance Of Registers

Maintenance Of Registers

Submitted by • about 3 days ago

ichapps.com - To lay down the procedure for maintenance of registers in quality control department. All the registers used in the quality control department shall be numbered. One register shall be maintained for the inwarding of registers, which is called register ...

Calibration Of  Bubble Flow Meter

Calibration Of Bubble Flow Meter

Submitted by • about 6 days ago

ichapps.com - To lay down the procedure for calibration of bubble flow meter. This SOP is applicable for quality control department. Clean the bubble flow meter thoroughly with methanol and allow to dry. Close the end of the flexible tube of flow ...